EN - CN
Guangzhou Eastern Solid Resource Recycling Center MSW Integrated treatment Plant Project

Project Standard: VCS

Project Type: Energy industries (renewable/non-renewable sources); Waste handling and disposal

Location: Fushan Village, Jiulong Town, Huangpu District, Guangzhou City, China

Methodology: Multiple Choice Waste Treatment Process (ACM0022 v3.0)

Installed capacity: 10.34 MW

Project grid connection: China Southern Power Grid


Description

The project started construction on October 12, 2017, with the aim of using anaerobic digesters to treat municipal solid waste (MSW) and generate electricity from recycled biogas. The project includes MSW collection, MSW pre-treatment system, biodiesel production system, anaerobic digester biogas purification, power generation system, and waste heat recovery.

The fresh waste of the project mainly includes kitchen and catering waste in Guangzhou, and the biogas generated from anaerobic digestion will be used for internal combustion engine power generation.

Emission reduction
Emission reduction information
  •  2,513,118

    tCO2e estimated removed during the accounting period

  • 359,017

    tCO2e estimated removed annually

Project outcomes
Project results

·  This project will utilize fresh waste to generate biogas, and effectively reduce air pollution and improve the environment around the landfill area by collecting some landfill gas and igniting the collected landfill gas;

·  The construction and operation of this project will provide new employment opportunities, increase taxes, and have a positive impact on the local economy.


SDG goals that the project meets

1692252285974366.png1692258612186036.png1692253745120223.png


X
The Climate Bridge Technical Advisor will wholeheartedly serve you!
1678944773846514.png
Climate Bridge Consultant

Multiple industries' number one '


021-6246-2036

business@climatebridge.com